Sludge treatment dosing equipment food wastewater pretreatment concentrated dissolved air flotation control panel

Product Introduction- It is a widely-used solid-liquid separation equipment in wastewater treatment industry. - It can effectively remove the suspensions, oils, and adhesives in the wastewater, one of the key equipment in the early processing. - It can remove the floated flocs that are difficult to precipitate. With it

Featured Products

Product Introduction
- It is a widely-used solid-liquid separation equipment in wastewater treatment industry. 
- It can effectively remove the suspensions, oils, and adhesives in the wastewater, one of the key equipment in the early processing. 
- It can remove the floated flocs that are difficult to precipitate. With its large capability, high efficiency, less space consumption and wide application. 
- It has been widely applied in oil, chemical, printing and dyeing, papermaking, refining, leather, steel, mechanical processing, starch, food and other wastewater treatment
Dosing Equipment for Sludge Treatment Thickening Dissolved Air Flotation Control Panel in Food Wastewater Pretreatment

Working Principle
The dissolving air tank can produce dissolving gas which later be released to the water waiting to be treated through the release device. It will form tiny bubbles of 20-40um and those tiny bubbles will combine with suspended solids in the waste water to make the proportion of these suspended solids smaller than water and gradually float to the surface to form scums. With a scraper system on the surface, these scums will be scraped into the sludge pool while the water will enter the clean pond from the lower part of the overflow trough.

Feature:
1.These tiny bubbles have great air flotation effect.
2.In the operating process, the low consumption of the polymer makes the cost pretty low.
3. It is very easy to control the water quality and water quantity by controlling the operation of the equipment strictly through the control system. 
 
Technical Parameters
 
 
Model
Capacity
(m³/h)
 
Air dissolving water
(%)
Motor power
(kw)
Scrape power
(kw)
Air compressor power
(kw)
Air dissolving tank
(mm)
Dimension
(L*W*H)
MPQF-5
4-5
35
3
0.37
1.5
400*1000
3300*1800*2200
MPQF-10
8-10
35
3
0.37
1.5
500*1512
4000*2100*2200
MPQF-15
10-15
35
3
0.37
1.5
500*1512
4400*2100*2200
MPQF-20
15-20
35
7.5
0.37
1.5
500*1512
4600*2400*2200
MPQF-30
20-30
35
7.5
0.37
1.5
500*1512
5200*2600*2400
MPQF-40
30-40
35
7.5
0.55
1.5
600*1880
6000*2600*2400
MPQF-50
40-50
35
7.5
0.55
1.5
600*1880
7000*2600*2400
MPQF-60
50-60
35
7.5
0.55
1.5
600*1880
7600*2800*2400
MPQF-70
60-70
35
7.5
0.55
1.5
650*2034
8400*2800*2400
MPQF-80
70-80
35
7.5
0.55
1.5
650*2034
9200*2800*2400
MPQF-100
90-100
35
7.5
0.55
3
700*1980
10000*2800*2600
MPQF-150
125-150
40
22
1.1
3
700*1980
13500*2800*2600
MPQF-200
175-200
40
22
1.1
3
800*2100
15800*2800*2600
MPQF-300
250-300
40
37
1.1
5.5
800*2100
19200*3400*2800

Process flow chartDosing Equipment for Sludge Treatment Thickening Dissolved Air Flotation Control Panel in Food Wastewater Pretreatment

Company Profile

Dosing Equipment for Sludge Treatment Thickening Dissolved Air Flotation Control Panel in Food Wastewater Pretreatment
Dosing Equipment for Sludge Treatment Thickening Dissolved Air Flotation Control Panel in Food Wastewater Pretreatment
Dosing Equipment for Sludge Treatment Thickening Dissolved Air Flotation Control Panel in Food Wastewater Pretreatment

Packing & Delivery
The normal package is wooden box(Size: L*W*H). If export to european countries, the wooden box will be fumigated. If container is too tigher, we will use pe film for packing or pack it according to customers special request.

Delivery time: 3~45 days after confirming order,  the detailed delivery date should be decided by the production season and order quantity.
 

FAQ
--------------------------------------------------------------------------------------------------------------------------------
Q: Are you trading company or manufacture?
A: We are both manufacture and trading company. We have over 10 years' professional experience as a waste water treatment equipment manufacturer and engineering service enterprise.

Q: Where is your factory located?
A: Yangzhou City, which is very close to Shanghai with only less than 3 hours' driving.

Q: Do you provide OEM service?
A: Yes. Any required logos is available.

Q: How could we trust you and your company? This is first time transaction?
A: Our company has more than 10 years professional experience. We cooperate over 1000 customers in China and overseas. We export nearly 40 countries all over the world. Welcome to our company and watch our plant production condition any time.

Q: What certificates do you have?
A: CE/ISO/SGS

Q: Do you offer after-sales service?
A: Yes. Engineers available.

Q: How long is your warranty?
A: One year after the arrival of the goods. During this period, as long as it is not a man-made damage, we send the damaged parts free of charge.

Q: What about your delivery Time?
A: Normally within 40 days against down payment.

Q: What about the package of your export product?
A: We use anticorrosion wooden case.

Q: What kind of transportation do you offer?
A: Customers decide freight mode, Air, Land & Sea

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours